I-80 bridge washing begins Monday

The Illinois Department of Transportation announced today that bridge washing on the Interstate 80 Mississippi River bridge (Fred Schwengel Memorial Bridge) in the Quad-Cities will begin Monday, Sept. 26.

There will be nightly lane closures, weather permitting, in each direction from 8 p.m. to 6 a.m. Monday through Thursday during the bridge washing, which is estimated to take one week to complete.

Intermittent lane closures also will be required on Illinois 84 under the bridge in Illinois and U.S. 67 (Cody Road) in Iowa.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

For IDOT District 2 updates, follow Twitter at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

Read original article here

Denial of responsibility! News Smashers is an automatic aggregator of the all world’s media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials, please contact us by email – [email protected]. The content will be deleted within 24 hours.

Leave A Reply

Your email address will not be published.